Blessed Sacrament was an interesting project that involved building a basement, first and second floor addition between three existing buildings that also joined those buildings together into one facility, with the added complexity of construction occuring with school in session. The new building not only joins the existing buildings, but also stands on its own, and Blessed Sacrament is now handicap accessible to multiple levels. The addition shown in the above photo is the center portion with the two arched doors and access ramp flanked by two of the existing buildings.
|